[1]
López-Lezama, J.M., Granada-Echeverri, M. and Gallego-Pareja, L.A. 2009. AC model for the combined dispatch of bilateral contracts and energy pool considering security constraints. Ingenieria y Universidad. 13, 2 (Oct. 2009).