[1]
Vega-Mejía, C.A. and Caballero-Villalobos, J.P. 2010. Combined Use of GRASP and Path-Relinking during Production Scheduling in order to Minimize Total Weighted Tardiness in a Machine. Ingenieria y Universidad. 14, 1 (Oct. 2010). DOI:https://doi.org/10.11144/Javeriana.iyu14-1.ucgp.