Combined Use of GRASP and Path-Relinking during Production Scheduling in order to Minimize Total Weighted Tardiness in a Machine. (2010). Ingenieria Y Universidad, 14(1). https://doi.org/10.11144/Javeriana.iyu14-1.ucgp