Vega-Mejía, C. A., & Caballero-Villalobos, J. P. (2010). Combined Use of GRASP and Path-Relinking during Production Scheduling in order to Minimize Total Weighted Tardiness in a Machine. Ingenieria Y Universidad, 14(1). https://doi.org/10.11144/Javeriana.iyu14-1.ucgp