Vega-Mejía, C. A. and Caballero-Villalobos, J. P. (2010) “Combined Use of GRASP and Path-Relinking during Production Scheduling in order to Minimize Total Weighted Tardiness in a Machine”, Ingenieria y Universidad, 14(1). doi: 10.11144/Javeriana.iyu14-1.ucgp.